Contractor: ORLEN SA.
Design: Płock CHP Plant
Scope: "Modernization of high-pressure steam pipelines 13.6 MPa/540 °C at the CHP Plant in Płock" – EPC (Engineering, Procurement, Construction)

Project stages:
Phased replacement of the existing high-pressure steam cross-header and the cross-header connections with reduction stations (SRS) – without replacing individual stations;
Phased replacement of individual outlet pipelines from boilers K1÷K7 between the superheater chambers and the high-pressure steam cross-header;
Construction of a new high-pressure steam pipeline to OLEFIN II on the new technological viaduct;
Dismantling the connections of the high-pressure steam cross-header with the existing starting header (KR) at the height of boilers K1, K3, K8;
Modernization of the high-pressure drainage system;
Modernization of non-pressure drainage collectors for existing ZA non-pressure tanks.
Years of implementation: 2022÷2027

