Contractor: ORLEN SA.

Design: Płock CHP Plant

Scope: "Modernization of high-pressure steam pipelines 13.6 MPa/540 °C at the CHP Plant in Płock" – EPC (Engineering, Procurement, Construction)


Project stages:

Phased replacement of the existing high-pressure steam cross-header and the cross-header connections with reduction stations (SRS) – without replacing individual stations;

Phased replacement of individual outlet pipelines from boilers K1÷K7 between the superheater chambers and the high-pressure steam cross-header;

Construction of a new high-pressure steam pipeline to OLEFIN II on the new technological viaduct;

Dismantling the connections of the high-pressure steam cross-header with the existing starting header (KR) at the height of boilers K1, K3, K8;

Modernization of the high-pressure drainage system;

Modernization of non-pressure drainage collectors for existing ZA non-pressure tanks.

Years of implementation: 2022÷2027